Doriza II Substation

Doriza II Substation


LOCATION Tripolis Municipality, Arcadia Prefecture, Greece
PROJECT TYPE Substation
LAND COVERAGE 8000 sqm
NOMINAL POWER 63.0MW
PROJECT STATUS Operational Since Νοέμβριος 2008
OWNERSHIP EuroEnergy

Overview


Substation Doriza II is in Tripolis Municipality, Arkadia Prefecture. The land where the substation is located is owned by EuroEnergy. It is equipped with a 20/150 KV, 63 MVA transformer, through which Garbis and Zefyros wind projects are connected to HV (high voltage).