Substation Euxeinoupoli is located in Almyros Municipality, Magnisia Prefecture. The land where the substation is located is owned by EuroEnergy. Initially, it was equipped with a 20/150 KV, 50 MVA transformer, through which Mpozalo Solar project is connected to High Voltage, while a 100MVA transformer was added afterwards by a new participant.