Substation Doriza II is in Tripolis Municipality, Arkadia Prefecture. The land where the substation is located is owned by EuroEnergy. It is equipped with a 20/150 KV, 63 MVA transformer, through which Garbis and Zefyros wind projects are connected to HV (high voltage).