Project Mitriko features 0.6 MW of installed solar capacity, located in Maronia Municipality, Rodopi Prefecture.
Operational since March 2013, this project spans 1.9 hectares with 2,520 Renesola panels and an ABB PVS800-57-0630-B inverter.eamlessly integrated into the power network via a ABB PVS800-57-0630-B inverter.